Select a Solution
Title Wrap
I Need a Solution
for

Combined Cycles, Cogeneration, and Gas Turbine Cycles

Leif Svensen, P.A., Bill Toombs, Santee Cooper, and Gen Minner, Ph.D., Scientech Inc., "Combined Cycle Modeling for Fuel Flow Predictions," (109 KB) User's Group Meeting, Charleston, SC, June 18-20, 2001.

Gene Minner, Scientech, Inc., "Modeling of Gas Turbine Engines, Heat Recovery Steam Generators, and Combined Cycles Using PEPSE®," (427 KB) User's Group Meeting, Clearwater Beach , FL , June 7-9, 1999.

Gene L. Minner, Scientech, Inc., "Emissions of Air Pollutants From Fossil Boilers and Gas Turbine Engines as Calculated by PEPSE®," (112 KB) User's Group Meeting, Clearwater Beach , FL , June 7-9, 1999.

Anup Singh, American Electric Power, "The Role of Gas Turbines in Future Power Generation," (24 KB) User's Group Meeting, Columbus, OH, June 23-27, 1997.

Ilan Ianovici and Vladimir Mankovski, Israel Electric Corporation, "Repowering Study Using PEPSE," (926 KB) User's Group Meeting, Charleston, SC, June 11-14, 1996.

Thomas W. McColloch, Rochester Gas & Electric Corporation, "PEPSE Analysis of Advanced Combustion Turbine Cycles," (605 KB) User's Group Meeting, Kansas City, MO, June 20-23, 1995.

George L. Slanina, Houston Lighting & Power Company, "Combined Cycle Performance Analysis," (2.99 MB) User's Group Meeting, Kansas City, MO, June 20-23, 1995.

Thomas W. McColloch, Rochester Gas & Electric Corporation, "PEPSE Analysis of Cogeneration Opportunities," (660 KB) User's Group Meeting, Lexington, KY, June 21-24, 1994.

William T. Brockman, Kentucky Utilities Company, "Ratio Analysis - Combined Cycle Studies," (1.76 MB) User's Group Meeting, Teton Village, Wyoming, June 15-18, 1993.

Thomas W. McColloch, Rochester Gas & Electric Corporation, "PEPSE Analysis of Pipeline Turboexpanders," (417 KB) User's Group Meeting, Clearwater Beach, Florida, June 23-26, 1992.

Brian Bohinsky, Westinghouse Electric Corporation, "Combined Cycle Power Plant Design and Modeling," (2.38 MB) User's Group Meeting, Clearwater Beach, Florida, June 23-26, 1992.

Michael J. Barrios, Florida Power & Light Company, "Replacing Defective Feedwater Heaters With Spares From a Steam To Combined Cycle Repowering," (1.21 MB) User's Group Meeting, Rochester, NY, June 18-21, 1991.

Renzo Colombo and Max de Carli, CISE-Tecnologie Innovative S.p.A and Giancarlo Aquilanti, ENEL Direzione delle Costruzioni, "PEPSE Modeling of Finned Tube Heat Exchangers for a Combined Cycle Plant," (1.41 MB) User's Group Meeting, Park City, Utah, June 7-9, 1989.

Thomas W. McColloch, Rochester Gas & Electric Company, "Gas Turbine Modeling With PEPSE," (2.25 MB) User's Group Meeting, Park City, Utah, June 7-9, 1989.

Renzo Colombo and Max de Carli, CISE-Tecnologie Innovative S.p.A. and Giancarlo Aquilanti, ENEL Direzione delle Costruzioni, "Evaluation of Performances of Oil-Fired Plant Converted to Combined Cycle Plant," (1.47 MB) User's Group Meeting, Park City, Utah, June 7-9, 1989.

F. Donatini, G. Trebbi, ENEL-CRTN, Italian National Electricity Board, "Technical and Economic Analysis of Gas-Steam Combined Electrical Power Plant," (20.9 KB) User's Group Meeting, King of Prussia, PA, June 22-24, 1988.

Dave Koehler, Commonwealth Edison Company, "An Evaluation of Various Process Steam Models for an Electric Utility Retrofit," (2.25 MB) User's Group Meeting, Charleston, SC, June 17-19, 1987.

Susan Jeffcoat , Gulf States Utilities, "Use of PEPSE for Thermal Cycle Analysis of Cogeneration Projects," (865 KB) User's Group Meeting, Clearwater, Florida, May 21-23, 1986.

Get a Solution for