Digital Safety System Case Study | Kozloduy
Organization: Kozloduy, a nuclear power plant operating in Bulgaria.
Challenge: Aging safety systems needed to be replaced to maintain plant health and safety.
Solution: Upgrade existing systems using Radiy’s platform to increase safety, availability, and long-term operational stability of the plant.
Results: The plant has been operating with this system for 12 years now with no reactor shutdowns due to faults or failure of the ESFAS systems or from the related electronics equipment.
Download the full case study to learn more.